A brief discussion on what professional electromechanical installation projects need to do before and after construction

2022-12-09 15:22:49

Electromechanical installationThe construction covers five major sections and is complex. Only when preparatory work is in place can the project proceed in an orderly manner. Below, based on the construction case of RunTay Electromechanical Installation Engineering, let's look at the procedures that construction units must complete upon entering the site.

The construction procedures for electromechanical installation should be determined based on the development direction determined by each unit of the project and the construction process of each unit project.

1. Principles for determining construction procedures

As the project management department of the general contractor, when determining the phased construction procedures for the project, the following points should be considered: Under the premise of ensuring the construction schedule, implement phased construction, coordinate the construction of each unit, ensure key areas while considering others, and ensure the project is commissioned on schedule.

For auxiliary projects in construction projects with small quantities, low difficulty, short cycles, and not urgently needed, it can be considered to be coordinated with main production workshop projects as a balanced construction interspersed project. All projects should be underground first, then above ground; first deep, then shallow; The arrangement follows the principle of prioritizing the main line and then the branch line, with consideration for details such as the impact of seasons on construction.

2. The general division of electromechanical installation construction stages can roughly be divided into the construction preparation stage, the construction phase, and the completion acceptance stage.

1. Construction preparation stage: The construction preparation stage is precisely the stage when the unit project starts and the necessary conditions are created. Generally, the following conditions must be met: construction permit must be obtained; Construction drawings undergo joint review; The construction budget has been prepared; The construction organization design has been approved and disclosed; Temporary construction facilities have been set up according to the overall construction plan design requirements and can basically meet the needs for construction and daily life after commencement; Materials and engineering equipment are properly stocked and can be gradually delivered to the site; Construction machinery and equipment have entered the site and can be operated normally; Labor plans have been implemented and necessary technical safety and fire prevention education has been conducted, allowing for deployment and entry at any time; The main civil engineering structure is completed, and the installation procedures for embedded and reserved pipelines and components in conjunction with civil engineering have been completed, meeting the conditions for delivery for installation construction.

2. Construction phase: Construction must be organized according to the requirements of the construction organization design, construction plan, construction drawings, and technical documents, following the established construction procedures, gradually forming the entire construction process from peak installation to linkage commissioning and no-load trial operation.