Materials have always been a rather troublesome task, especially electromechanical installation materials. Because it touches on so many things, and all must be made to ensure nothing goes wrong, which is very difficult. So how can you make the best materials for electromechanical installation? Below, the editor will share the specific table of contents with us.
How to make electromechanical installation materials?
1.Electromechanical equipment installation projectsProject Materials and File Directory
1. One copy each of the equipment installation project contract approval card and a copy of the contract;
2. One original and one copy each of the project commencement statement;
3. One copy of the construction arrangement plan review form and one copy of the construction arrangement plan;
4. One copy of the drawing review meeting record;
5. January monthly summary project inspection form and one original construction log;
6. One copy of the Planning Institute contact form and the project change form;
7. One photocopy of the inspection form for the sheltered project;
8. One photocopy of the contract performance review report;
9. One photocopy of the completion statement inspection statement.
2. Materials for the final settlement of electromechanical installation
1. Contract documents
The co-signing unit shall present the agreement and notes, contract, and supplementary agreement;
2. Engineering professional materials
1) Statement of commencement and completion and contact form for construction period delays;
2) Engineering inspection records;
3) Engineering inspection materials;
4) Completed project drawings signed and approved by the project contractor, supervisor, and client, in which the client is the project handling unit responsible for the project;
5) Completion inspection records for shaded works;
6) Geological survey report (to be presented if necessary)
3. Technical materials
1) Construction schedule or planning plan;
2) The drawing review records meeting minutes, design estimates, project completion settlement, or on-site verification forms; when presenting completion materials, the serial numbers must be uniform;
3) Raw material and machinery quality verification and price verification forms;
4) Inspection receipt form for the pickup of materials (machinery and equipment) supplied by Party A;
5) Initial elevation measurement records for terrain and landform design;
4. Pre-liquidation materials
The project completion settlement statement and electronic disk assigned by the project contractor (stamped with the contractor's company seal and the qualification seal of the project cost staff, signed and approved by the construction unit, two in total, presented by the project handling unit).
5. Other materials
1) The original and photocopies of the official fee calculation standards for construction enterprises; copies of the original and copies must be kept and presented by the project contractor;
2) Relevant "client announcements, orders, meeting records, correspondence, claims, etc.", related to the project final accounts, shall be organized and presented by the project handling unit;
3) According to the contract, other related hazardous project budgets such as construction period materials shall be organized and presented by the project handling unit;
4) Material delivery receipt form, document directory, page numbers, serial numbers, etc. should be clearly established.
The above is the "electromechanical installation material methods" brought to us by the editor. We hope it is helpful to you. Here, we can see that even materials have many categories and can be further subdivided into more categories. These are all things we need to master skillfully.