2022-10-27 15:44:54
Equipment relocationIn the workflow, to better ensure the safety of relevant personnel and the staffing, installation, and relocation work, safety procedures are often presented in the corresponding tasks of loading and unloading staff.
Before installing or relocating large and medium-sized equipment, carefully check whether the specialized tools used are intact. Trustworthy. Check whether the various lifting devices selected comply with regulations and are not suitable for overload use. Depending on the installation and relocation work objectives, necessary safety protective equipment must be worn.
For installation, loading, and unloading of medium and large equipment, all items should be ensured: not too heavy, not too heavy, not too small. Smooth palletizing. Binding and reinforcement. Hands-on human operation. When loading or unloading items, staff should avoid hitting them. When multiple people move the same item, dedicated staff should guide them, maintain a proper distance, and keep a proper distance, shoulder to shoulder, and keep pace in unison.
When installing and unloading equipment, as well as organic chemical hazardous materials, flammable and explosive items, necessary safety protective equipment must be worn. When transporting or unloading the vehicle, the lifting point must be carried out according to the specified suspension requirements, and the housing support legs must be checked to ensure they are secure. After suspension is completed, a trial lifting must be performed first, followed by crane inspection.
People should not stand between items and front barriers when riding and drive safely; vehicles are not allowed to board without a clear stop. When using a crane for loading or unloading raw materials, close cooperation with crane operators should be maintained, and attention should be paid to changes in the lifting position and sitting posture at all times. It is strictly forbidden to stand under the crane.
For equipment relocation companies, the time required for equipment relocation and loading and unloading is relatively long,Equipment relocationLow work efficiency is also due to the long loading and unloading time required. So how can everyone improve loading and unloading efficiency?
YesEquipment relocationComprehensive inspection and maintenance are carried out. Equipped loading and unloading enterprises to organize repair workers according to the technical transformation work plan, while also contacting equipment manufacturers, who will dispatch professional technical personnel to relocate all enterprises. Lifting and hoisting. Carry out a major overhaul of lifting equipment, either replace parts, rework or maintenance, or promote efficient relocation based on this work.