1. When installing lifting holes in workshops, several important principles are generally required
1. The horizontal transport of equipment is relatively short;
2. The practical area occupied by the transport corridor is relatively small;
3. The hoisting hole should be positioned as close as possible to equipment with frequent maintenance;
4. The lifting holes on each ground floor building should be set at the same vertical orientation;
5. The installation of lifting holes should be arranged on the ground floor; 6
6. Some equipment must be placed in the direction of the lifting hole, and the area near the lifting hole must have a large door open to facilitate equipment entry and exit.
2. During practical planning, based on the orientation of the lifting holes, when the factory building is generally long, it is suitable to install the lifting holes close to the center of the factory and close to the building wall; If the length is not too long, it is suitable to install the lifting hole at one end of the factory building against the gable wall. If lifting holes cannot be set up inside the factory and multi-story lifting holes cannot be uniformly vertical, then consider lifting the equipment outward from a concrete beam from one floor into the workshop.
Third, increase the size of the hole
In practice, during the planning process, when confirming the hoisting cavity, it is generally necessary not only to consider whether the equipment on the current floor can be lifted, but also to ensure that equipment with very large diameters on several floors can also be lifted. In practice, raised cavity planning generally adopts a square shape.