Five major requirements for electromechanical equipment installation

2022-09-21 17:27:16

       Installation of electromechanical equipmentConstruction:


  Mark and position according to the equipment process layout plan, installation construction drawings, foundation drawings, equipment general scale, and spacing requirements prepared by the process technology department, arrange foundation construction and equipment transfer and positioning. When designing the equipment process layout diagram, the following factors should be considered for equipment positioning. Below,RunTay equipment installationA brief introduction from the manufacturer.


  (1) It should be adapted to the requirements of the process flow.


  (2) It should facilitate the storage, transportation, and on-site organization of workpieces.


  (3) c The external dimensions of its subordinate installations, the limit azimuths of moving parts, and safety spacing.


  (4) Requirements to ensure the safety of equipment installation, maintenance, and operation.


  (5) Matching the factory building and equipment operation, including door width and height, factory span, height, etc.


  Equipment installation and leveling should be properly done according to relevant mechanical equipment installation acceptance standards, ensuring stability, reducing vibration, preventing deformation, ensuring machining accuracy, and avoiding unreasonable wear. Before installation, technical briefings must be conducted, and construction personnel should carefully study relevant equipment materials to understand equipment performance, safety requirements, and necessary construction matters.


  Installation of electromechanical equipmentDuring the process, construction of foundations, installation of links, electrical wiring, and other items must strictly follow construction specifications. If there are special requirements during the installation process such as constant temperature, earthquake resistance, dustproofing, moisture resistance, or fire resistance, measures should be adopted, and construction can only proceed when conditions are met.