Installation of electromechanical equipmentMethods of skill management
1. Management of construction site materials
Material management is a key part of project construction; materials must be procured before the project starts. Before ordering materials, the production capacity and qualifications of the material production unit should be reviewed to avoid delays caused by insufficient supply, substandard quality, or complicated transportation routes. After the materials arrive at the factory, the construction unit should arrange for professional personnel to inspect them. The inspection documents must be complete. Non-compliant materials and equipment should be returned or exchanged, and materials and equipment with quality issues should be re-inspected.
2. Key links in construction skill management
Technicians should carefully review and review drawings according to current national and skill standards, and formulate a correct and reasonable construction plan. The construction plan mainly includes four aspects: confirmation of construction methods, selection of construction machinery, arrangement of construction sequence, and construction schedule. Different construction plans have varying durations, equipment, and costs, so choosing the right construction plan is key to reducing costs.
3. After construction is completed, a completion inspection should be conducted
It must comply with contract requirements and actual document requirements, and comply with current national construction inspection standards. The project must be completed without omissions, and the primary process equipment and supporting facilities must be commissioned and qualified for production; Complete documentation for handover and archiving requirements; Production preparation work habits the requirements for production initiation; Environmental protection, labor safety, sanitation, and fire protection facilities have been installed as required; A few non-primary equipment may not be installed as required, but it does not affect production; Only after the equipment passes trial operation and the quality and quantity of products available for production meet the planning requirements can inspection proceed.