Inspection after equipment installation is completed

2022-09-21 17:22:58

1. Must comply with contract provisions and practical document requirements, and comply with current national construction inspection standards. The project must be completed without omissions, and the primary process equipment and supporting facilities must pass joint commissioning and debugging to be ready for production use. Complete submission documents must meet archiving requirements; Production preparation work adapts to production requirements; Environmental protection, occupational safety, sanitation, and fire protection facilities have been installed and put in place as required; A small amount of non-primary equipment may not be installed as required by practice, but it does not affect production; Only after the equipment passes trial operation and the quality and quantity of products available for production meet the planning requirements can inspection proceed.


2. Mechanical and electronic installation engineering basically runs through the entire construction process, but its primary part begins after the main project is completed, resulting in a short construction period characterized by simultaneous construction. This not only requires a sound project organization but also rigorous construction management systems and emergency plans for electromechanical installation. At the same time, it demands sufficient human, material, and financial resources to ensure the manpower, material resources, and financial demands of the construction process.