Installation of electromechanical equipmentWhat preparations should be made before and after construction?
Installation of electromechanical equipmentThe construction involves five branches and is complex in content. The project must proceed in an orderly manner and prepare in advance. Based on the construction process of each unit project, determine the construction procedures for electromechanical installations. The phased construction organization design should consider the following issues: phased implementation, controlling construction priorities while ensuring the construction schedule, and considering other factors to ensure timely production.
Auxiliary engineering projects require less workload, less difficulty, short cycles, and are not urgently needed. They can cooperate with main production workshop projects to achieve balanced construction interweaving. Project design should prioritize underground and then above-ground construction, with deep and shallow areas first, and in principle, divide before separate, taking into account the impact of seasonal factors on construction.
GeneralInstallation of electromechanical equipmentThe stages can generally be divided into the preparation stage, construction phase, and construction inspection phase.
1. Construction Preparation Stage: The construction preparation stage is the stage to create the conditions required for the unit project. Generally, the following conditions must be met: construction permit request; Construction drawings reviewed by the meeting; Prepare construction budgets; Approval and disclosure of the construction organization design; Temporary construction equipment is set according to standard requirements for the overall construction floor plan, which basically meets construction and schedule requirements; Construction machinery and equipment have arrived on site and can be carried out continuously; Construction machinery and equipment have been brought into the site, ensuring normal operation; Temporary construction equipment has been set up according to standard requirements for the overall construction layout, and the main civil engineering structure is basically satisfactory. The main structure of civil engineering is completed, and the supporting components for embedded pipes and components have been completed, meeting the conditions for handover of the installation.
2. Construction Phase: Based on the construction organization design, construction plan, construction drawings, and technical documents, develop the construction procedure and gradually form the entire construction process from the peak of the installation to joint adjustment and no-load trial operation.
3. Completion inspection stage: includes civil works, installation, and decoration, with internal inspection conducted by the contractor. The construction unit shall organize the design, supervision, and relevant contractors to conduct inspections. After passing inspection, the inspection procedures and related matters shall be handed over.