Softens the waterEquipment installationpipeline connections
1. Please refer to the relevant content of local building standards for pipeline connections;
2. Connect the outlet pipe according to the controller's aperture;
3. The inlet pipe uses manual valves, bypass valves between inlet pipes, sampling valves for the inlet pipe sections, and Y4-shaped filters to prevent contaminants from clogging the inlet pipe and preventing equipment from operating normally. Note that multiple systems operating in parallel may enter and exit the waterway on the same route.
The drainage pipe connection length is greatly shortened, the curvature is reduced, and the cohesion of the control valve groove does not exceed 6 meters.
5. When connecting the drainage pipe to the drainage system, ensure that the water surface of the drainage system maintains a certain distance to prevent wastewater from flowing back into the water softener.
6. No valves of any kind shall be installed inside drainage pipes;
7. The connection of the saltwater pipeline must be sealed with excellent quality; otherwise, it will affect the regeneration function of the water softener equipment.
8. Each pipeline must be equipped with an independent bearing; the gravity and stress of the pipeline must not be transferred to the control valve.