Installation of electromechanical equipmentTechnical management methods
1. Management of construction site materials
Material management is a key part of construction projects; materials must be procured before the project starts. Before placing material orders, the production capacity and qualifications of the material manufacturer should be reviewed to avoid delays caused by insufficient supply, substandard quality, or chaotic transportation routes. After the materials arrive at the factory, the construction unit should arrange for professional personnel to inspect them. The inspection documents must be complete. Non-compliant materials and equipment should be returned or exchanged, and materials and equipment with quality issues should be re-inspected.
2. Key links in construction technical management
Technicians must carefully review and review drawings according to current national and technical standards, and formulate a correct and reasonable construction plan. The construction plan mainly includes four aspects: confirmation of construction methods, selection of construction tools, arrangement of construction sequence, and construction schedule. Different construction plans will have varying timelines, equipment, and costs, so choosing the right plan is key to reducing costs.
3. After construction is completed, a completion inspection should be conducted
It must comply with contract requirements and practical documents, and comply with current national construction inspection standards. Upon project completion, there should be no missing items. Primary process equipment and supporting equipment must pass joint commissioning and testing, and be ready for production use; Complete documentation for handover and archiving requirements; Production preparation work adapts to the needs of commissioning; Environmental protection, occupational safety and hygiene, and fire protection equipment have been installed and installed as required; A few non-primary equipment may not be installed as required by practice, but this does not affect production; Only after the equipment passes trial runs and the quantity and quantity of available products meet planning requirements can inspection be conducted.