Construction mechanical engineering and civil engineering are closely interwoven during the construction process. Harmonious management and collaboration among various disciplines have become key to construction plans, directly affecting construction quality, schedule, and cost. Harmonious handling of interwoven construction is especially important. Considering the many specialized projects in the construction machinery system, strong skills, narrow underground passages, numerous pipelines, chaotic comprehensive pipeline construction, and difficulties in construction scheduling, especially the harmonious handling and collaborative services of various electromechanical installation specialties. So, let's learn how to do it wellElectromechanical installationProcess control!
How to properly control the electromechanical installation process
The irony of the pipeline exterior door treatment is very important. If the oil and hemp are blocked, the ring seams around the pipe should be consistent, with small gray areas tightly tightly twisted, then treated with waterproof membrane and connected to the pipe by at least 20cm. Generally, oversight in this area can easily lead to leakage, so strict control is required to avoid quality issues caused by wall leakage.
During the embedded sleeve embedding stage of beams, pipeline optimization should be considered. For commercial projects, analyzing the net height of the building is especially important. For electromechanical installation projects, scheduling and embedding are fundamental tasks, especially when beams are inserted into the sleeve, meeting standard requirements and being embedded in one-third or the center of the beam in advance to ensure clear height and achieve comprehensive optimization.
According to standard requirements, hangers and fixed brackets should be installed reasonably. Large pipeline installations should first install a bracket scheme to ensure the safety of the bracket.
Sewage and sewage pipe vertical lines, horizontal slope, pure accessories, reasonable supports, and pure height analysis meet requirements. For sewage and sewage main pipes, if spatial dimensions permit, T-shaped tees with a 45-degree inclinement should be selected whenever possible. This helps ensure the drainage pipe is cleared later on. (William Shakespeare, Hamlet, wastewater, wastewater, wastewater, wastewater, wastewater) Drainage is controlled from the height of outdoor inflow and outlet, so beams and boards are installed as much as possible.
Risers and risers use specialized accessories, making the floor smooth and dense, with a good tactile feel. Drainage is tightly sealed, preventing debris from invading during construction. Especially for engineering projects, the drainage equipment area requires long construction processes, strict sealing, and no hidden dangers.
The drainage point of the drainage pipe formwork is related to the water supply drainage point and the subsequent installation of sanitary fixtures. Only by passing through the pipe template can the route be guided, reaching consistent house type standards and accounting for the same house type information. Angled tee, 45-degree fittings are highly sensitive, have low resistance, are not easily clogged, and have good drainage. The bathroom drainage riser should be adjusted to 18-20cm; if it is too low, it will clash with the ceiling.
Electromechanical installationBuffer Inner Tube Placement: The buffer inner tube is fixed with a pipe clamp and clamp fastening meeting standard requirements, facilitating later device scale control and quality assurance.
Rainwater, air conditioning, risers, and outdoor rainwater risers are generally not secure and often fall off, so secure brackets at each riser installation corner. Household registration boards are installed on the outer wall of air conditioning ducts, with the inner wall blocking the entrance to prevent mosquitoes and foreign objects from invading. Crooked sleeves are prohibited from flipping the household register.
Install the radiator, installing the radiator from the window. At the sound angle, the riser card should be 15-20cm away from the wall to ensure disassembly and correction. The safety distance between the radiator and the socket should not be less than 20cm.
Regarding drainage, during installation, the roof ventilation ducts are embedded in the pre-embedded pipes, without considering flue control scales. Later, the ventilation ducts cannot rise vertically, so the built-in ventilation ducts should consider avoiding the scale. Consistent organizations of the same scale are lined up in a row.
Civil air defense sealing sleeves should be prepared on the maintenance sealing partitions at the civil air defense port and on all pressure pipelines passing through the roof. For practical protective casings, see Civil Engineering 07FS02 (Civil Air Defense).
During the embedding process, the elevation and point were accurate, boxes and boxes were securely bundled, and the molds were removed and cleaned promptly to ensure the secondary cleaning pipeline was unblocked. Pre-embedded control directly affects the smooth operation of the subsequent installation.
The splitting box is built inside the shear wall, embedded simultaneously with the primary structure, positioned inside the box, and angled steel is selected to ensure dimensional control with the wall. One-time built-in construction, labor-saving, compact cabinet, reliable quality.
The centrifugal glass wool casing uses an aluminum foil protective layer, with an insulation thickness generally of 5-6cm. Insulation pipes are relatively soft, making construction difficult. Joints are easily bonded together, causing cracks and unattractive shapes. However, they have good fire resistance ratings and insulation performance, so workers should perform precise operations to achieve the desired effect.
Mechanical and electrical installation signs generally include text arrows indicating the medium, system name, and leakage of the medium. In addition to identifying pipelines, it is also necessary to identify utility rooms and equipment rooms. It is recommended to apply consistent production templates to prominent areas.
That's how to do it wellElectromechanical installationProcess control. If you want to learn more, feel free to contact us anytime!