Large-scaleEquipment relocationWhat should you pay attention to?
1. During the equipment hoisting process, the first priority is that crane operators, crane operators, cable operators, commanders, and workers must all hold national special qualification certifications and pass the group's special qualification level inspection and on-site practical operation verification before they can undertake project construction tasks.
2. The contractor must effectively control the lifting and hoisting process, and all transfer work must comply with relevant regulations or technical standards, as well as meet customer requirements. Construction arrangements for workers must comply with work health, safety, and quality assurance. During operations, all operators must prioritize safety awareness, follow procedures, and strictly avoid violations.
3. Lifting equipment must use specialized lifting equipment, machinery, or devices that have been strictly verified according to national technical standards, such as truck cranes, truck-mounted cranes, motorized forklifts, manual forklifts, tank wheels, etc.
In summary, during the process of lifting and transferring large equipment, we strive to achieve zero hazards and safe operation.