A brief discussion on the construction requirements for electromechanical equipment installation

2022-09-22 15:55:24

       ElectromechanicalEquipment installationConstruction:


  Mark and position according to the equipment process layout plan, installation construction drawings, base drawings, equipment contour dimensions, and mutual distances drawn by the process skills department, organize foundation construction and equipment transfer and positioning. When planning the equipment process layout diagram, the following factors should be considered for equipment positioning. Below is RunTayEquipment installationA brief introduction from the manufacturer.


  (1) Adapt to the needs of the process flow.


  (2) It should facilitate the storage, transportation, and on-site cleaning of workpieces.


  (3) The external dimensions of electromechanical equipment and its auxiliary equipment, the limit positions of moving parts, and safety distances.


  (4) Requirements to ensure the safety of equipment installation, repair, and operation.


  (5) Matching the factory building and equipment operation, including door width and height, factory span, height, etc.


  Equipment installation and leveling should be properly done according to relevant mechanical equipment installation inspection standards, ensuring stability, reducing noise, avoiding deformation, ensuring machining accuracy, and preventing unreasonable wear. Before installation, a skills briefing should be conducted, organizing construction personnel to carefully study relevant equipment technical materials, understand equipment performance, safety requirements, and key construction matters.


  Installation of electromechanical equipmentDuring the process, construction of foundations, installation of links, electrical wiring, and other items must strictly follow construction specifications. If there are special requirements such as constant temperature, vibration resistance, dustproofing, moisture resistance, or fire protection during the installation process, measures should be taken, and construction can only proceed when conditions are met.